Spring water main flushing set to begin

Service Announcement

The City’s Public Works team is set to begin its spring water main flushing program, which is an important step to ensure quality drinking water. This work is anticipated to proceed on a rolling basis throughout the community until June 15. 

Flushing removes sediments, deposits and biofilm build-up from the water system, which improves taste and odours, reduces turbidity and also provides system-wide improvements, which results in cost savings.  
Unidirectional flushing also makes it possible for the Public Works crew to perform annual maintenance on system valves to ensure they are functioning correctly. 

During this time, residents may experience sediment or discolouration in their water. While this sediment is bacterially harmless, it may cause some discolouration of laundry if not detected. To avoid any inconvenience, check the water supply colour prior to using washing machine by running a household tap for several seconds.

If your property is experiencing dirty water, simply run the cold water tap until the water runs clear.  This can take several minutes, depending on the severity of the discoloured water.

Thank you for your cooperation. If you have any questions about water quality, visit penticton.ca/water-quality or contact City Yards at 250-490-2500.